Ajora Himalaya GroupEnterprise Management Platform

Production planning

Demo DataManufacturing

Plan production targets, assign factory lines, and track approval-to-production flow for Ajora Himalaya operations.

Planned items

3

Approved

1

In production

1

Planning board

Structured list view, ready to become a drag-and-drop planning board later.

Work orderProductTargetRequired raw materialsPlanned dateLineStatus
WO-26-0310Agro Fertilizer Blend 25kg900 kg
Mineral mixPackaging bag 25kg+1 more
10 Mar 2026Line C – BlendingIn production
WO-26-0312Ajora Soybean Oil 1L12,000 ltr
Soybean seed (bulk)PET bottle 1L+1 more
12 Mar 2026Line A – BottlingApproved
WO-26-0314Ajora Soybean Oil 5L3,000 ltr
Soybean seed (bulk)Carton – 5L packs (6 pcs)+1 more
14 Mar 2026Line B – PackagingDraft

Today’s focus

Quick operational checklist for production supervisors (demo panel).

Material readiness

Bottles & cartons are below reorder level

Trigger purchase orders before releasing the next batch.

Line utilization

Line A scheduled 86% for this week

Avoid over-allocation to reduce changeover losses.

Approvals

1 draft plan awaiting approval

Approve to lock BOM and material reservations.